A tenant improvement allowance (TIA, or TI allowance) is the money your landlord puts toward building out your space. In Denver right now there are really two TI allowance markets. Large office tenants signing long leases downtown are being offered numbers that would have been unheard of three years ago. Small tenants taking 1,500 to 6,000 SF of retail, restaurant, fitness, or service space are getting a fraction of that, and most of them are finding out the allowance covers less of the build than they assumed. This guide covers both, with the numbers we are seeing on real Denver deals in 2026.
The Short Answer: What Denver Landlords Are Offering in 2026
Large office deals, long terms: $125 to $150 per SF. Denver office vacancy is still high, and landlords are paying to fill floors. In September 2026, Andy Cullen of TRE told Bisnow that TI allowances have grown from the $90 to $100 per SF range to $125 to $150 per SF, as more tenants sign leases of 10 years or longer. The City of Denver's own lease with Alterra Mountain Company at 101 W. Colfax shows the same thing: about $9.7 million in rent credits toward a $19.3 million renovation of nearly 65,000 SF, on a 12-year term with close to two years of free base rent (Denver Gazette). Brokers say the exception is Cherry Creek and new construction, where concessions are still hard to come by.
Small tenants, retail and service space: first offers of $11 to $56 per SF. That is what landlords put on the table in 2026 for tenants we walked spaces with, on spaces under 6,000 SF, before any negotiation:
- A studio tenant, 3,574 SF: $200,000, about $56 per SF. The best first offer we saw this year.
- A fitness studio, roughly 5,500 SF: $150,000 offered, about $27 per SF. The tenant pushed for $200,000 or more. After the walkthrough, our read was that the build would run $100,000 to $200,000 past the allowance.
- A community gathering space, about 1,800 SF: $11 per SF offered, about $20,000, against a restroom (about $30,000) and a kitchen (about $35,000) the tenant could not open without. The tenant countered at $20 to $25 per SF.
- A retail franchise: the landlord would only say they would cover "the amount." No number. A tenant cannot budget against that.
The gap between those two markets is the most important thing to understand before you start negotiating. Headlines about record TI packages are about 65,000 SF office leases with 12-year terms. If you are leasing a 2,500 SF storefront on a five-year term, that is not your market.
How a TI Allowance Actually Works
The allowance is written into your lease, usually as a dollar amount per square foot (for example, $40/SF on 3,000 SF = $120,000) or as a lump sum. A few things in that clause matter more than the headline number.
It is usually a reimbursement, not a check up front. Most landlords pay the allowance after work is done and documented: paid invoices, lien waivers from the contractor and subs, and often a certificate of occupancy. That means you, or your lender, carry the construction cost until the landlord pays. If you are using an SBA loan or a line of credit, line the draw timing up with the landlord's reimbursement terms before construction starts.
It is a ceiling, not a budget. If the allowance is $40/SF and the build costs $90/SF, you pay the $50/SF difference. The landlord's contribution does not move unless the lease says it does.
Unused allowance is often lost. Many leases say any allowance not spent by a deadline goes back to the landlord. Ask for unused dollars to convert to a rent credit, and make sure the deadline leaves room for a slow permit.
Turnkey is a different deal. In a turnkey lease, the landlord builds the space to an agreed plan and pays for it. You give up control of the contractor, the schedule, and the quality, and the landlord usually prices that into your rent.
What the Allowance Covers, and What It Usually Does Not
Read the definition in your lease. It decides which of your dollars count.
- Usually covered: hard construction costs. Demolition, framing, drywall, doors, ceilings, flooring, paint, and the mechanical, electrical, and plumbing work that stays with the building.
- Sometimes covered, often capped: soft costs like architectural and engineering fees, permit fees, and project management. Many leases cap soft costs at a share of the allowance. Read the cap before you hire an architect.
- Usually not covered: furniture, fixtures, and equipment you take with you, data cabling and AV, signage, security systems, and moving costs.
- Watch for: a landlord supervision or management fee taken out of the allowance. Ask whether there is one and how much it is before you compare offers.
Base Building Work Is the Allowance You Do Not See
The cheapest dollar in a buildout is one the landlord spends before your allowance starts. Your lease's work letter defines what the landlord delivers. Anything the landlord fixes as base building work, outside the allowance, leaves your full allowance for your own space.
On small spaces, the items that move the most money are:
- HVAC. If no dedicated rooftop unit serves your space, adding one can run $20,000 or more. On one retail franchise deal this year, a missing rooftop unit reportedly killed the tenant's previous location.
- Restrooms and ADA path of travel. A restroom the code requires for any tenant is a building problem, not a tenant upgrade. Argue it that way.
- Electrical service. If the panel cannot carry your load, the upgrade is a base building cost.
- Restaurant infrastructure. Grease interceptor, roof penetrations for exhaust, and gas service. We cover this in the Denver restaurant buildout guide.
On the gathering space above, the strategy was to itemize the restroom and the kitchen in the letter of intent, rather than ask for a bigger per-SF number, and position the restroom as something any tenant would need. A landlord who will not move on $11/SF will often move on a specific line item that makes the space leasable.
Where the Allowance Runs Out
Compare the allowance to what the build costs. From our Denver TI cost guide, a standard office TI runs $80 to $130 per SF, medical clinics run $120 to $200 per SF (complex medical can reach $300 or more), and restaurants run $150 to $300+ per SF.
A 3,000 SF standard office TI at $80 to $130 per SF costs $240,000 to $390,000. A $40/SF allowance pays $120,000. The tenant carries $120,000 to $270,000.
That gap is normal. The problem is finding it after the lease is signed, when you have no leverage left. The fitness studio above learned the size of its gap from a walkthrough before signing, which is when it can still be negotiated.
How to Negotiate a Better TI Allowance in Denver
- Price the build before you sign the LOI. Get a contractor into the space for a walkthrough and a rough budget first. "We need $180,000 because the build is $260,000" is a negotiation. "Can you do more?" is a request.
- Itemize the asks. Put the specific base building items in the LOI: the rooftop unit, the restroom, the electrical service. Line items are easier for a landlord to approve than a higher per-SF number.
- Trade term for dollars. Landlords pay for certainty. Denver brokers report bigger packages going to tenants who sign longer. If you can commit to seven years instead of five, ask what that buys.
- Ask for free rent through the build. Tie rent commencement to permit issuance plus a construction window, or to the certificate of occupancy, not to lease signing. Denver permit timelines are long enough that this clause can be worth more than a few dollars of allowance.
- Protect the unused balance. Convert unspent allowance to rent credit, and push the use-by deadline past a realistic permit and build schedule.
- Ask about an amortized allowance. Some landlords will fund more than the base allowance and add the extra, with interest, to your rent. That trades cash today for a higher rent, so run the math before you take it.
The vacancy picture behind all of this is in our post on Denver office vacancy and TI leverage. Before you sign, run through the contract red flags too.
TI Allowance FAQ
What is a typical tenant improvement allowance in Denver?
It depends on the deal. In 2026, large office tenants signing long downtown leases are seeing $125 to $150 per SF, per Denver brokers. On small retail and service spaces under 6,000 SF, the first offers we saw from landlords ranged from $11 to $56 per SF, before negotiation.
Does the TI allowance cover architect and permit fees?
Sometimes. Many leases allow soft costs but cap them at a share of the allowance. Read the definition in your lease before you hire a designer.
When does the landlord pay the TI allowance?
Usually after the work is complete and documented with paid invoices and lien waivers, sometimes in draws during construction. Plan to fund the build until the reimbursement arrives.
What happens if I do not use the whole allowance?
Unless the lease says otherwise, the unused balance often goes back to the landlord. Negotiate for it to become a rent credit.
Is the TI allowance enough to cover my buildout?
Rarely, on a small space. A standard Denver office TI runs $80 to $130 per SF and a restaurant $150 to $300+, against small-tenant first offers that mostly sit well under $60 per SF. Get the build priced before you sign so you know the gap.
Know Your Number Before You Sign
We walk spaces with tenants during the lease negotiation, not after. You get a budget range for your layout, the base building items worth putting in the LOI, and the size of the gap between the allowance and the build. See how we run tenant improvement projects, or request a walkthrough or call 833-SNYDER-9 (833-769-3379).